Mutorashanga Transformers Installation & HT Construction
Mutorashanga Transformers Installation & HT Construction
Project Details
Client
Project Type
Location
Completion Date
Scope of Work
Tadphic Projects (Pvt) Ltd successfully executed the installation of power transformers and high-tension (HT) line construction in Mutorashanga, a critical project aimed at improving electrical supply reliability to mining and residential areas.
The project involved the erection of new HT poles, stringing of overhead conductors, and installation of step-down transformers to support the growing energy demand in the region. Tadphic Projects provided end-to-end electrical engineering services — from design and procurement to testing, commissioning, and safety verification — ensuring full compliance with ZESA and national regulatory standards.
Key Services Provided
- Transformer installation and commissioning
- HT line construction and termination
- Electrical testing and calibration
- Substation maintenance and upgrades
- System reliability and performance checks
Project Outcome
The project achieved a stable and efficient energy supply for industrial operations in Mutorashanga. Network reliability was significantly improved, reducing downtime and optimizing power distribution for long-term sustainability.