Mutorashanga Transformers Installation & HT Construction

Project Details

Client

ZESA Holdings (Northern Region)

Project Type

Electrical Power Transmission & Distribution

Location

Mutorashanga, Mashonaland West, Zimbabwe

Completion Date

30/08/2024

Scope of Work

Tadphic Projects (Pvt) Ltd successfully executed the installation of power transformers and high-tension (HT) line construction in Mutorashanga, a critical project aimed at improving electrical supply reliability to mining and residential areas.


The project involved the erection of new HT poles, stringing of overhead conductors, and installation of step-down transformers to support the growing energy demand in the region. Tadphic Projects provided end-to-end electrical engineering services — from design and procurement to testing, commissioning, and safety verification — ensuring full compliance with ZESA and national regulatory standards.

Key Services Provided

  • Transformer installation and commissioning
  • HT line construction and termination
  • Electrical testing and calibration
  • Substation maintenance and upgrades
  • System reliability and performance checks

Project Outcome

The project achieved a stable and efficient energy supply for industrial operations in Mutorashanga. Network reliability was significantly improved, reducing downtime and optimizing power distribution for long-term sustainability.